One-Page MVP Site Setup Developer

Here’s a clear and concise brief based on the transcript:

Task Brief: MVP Website Setup

Project Overview:

We are launching a Minimum Viable Product (MVP) version of the site using a simple one-page template with anchor link navigation. This version is a quick-launch version to go live by end of this week or early next week, ahead of a larger, more complex site build.

Scope of Work – MVP Phase:

  1. Base Template Adaptation

• Use the existing workflow template as the foundation.

• Modify layout and sections to accommodate supplied content.

  1. Hero Section

• Add email sign-up field (currently missing).

• Rework layout to allow space for concise subtext.

• Reduce size of existing hero text if needed.

  1. Rotating Value Proposition Section

• Introduce a cycling feature that showcases key terms (e.g., “Tokenized Property”) with corresponding graphic elements.

  1. FAQ Section

• Add an accordion-style FAQ section.

  1. Branding Implementation

• Apply supplied brand guidelines (funky fonts, color palette, basic logo).

• Install and apply required web fonts.

  1. Imagery

• Source suitable imagery if client assets are not provided in time.

  1. Technical Setup

• Assist with domain setup, connection, and go-live support.

Timeline:

• Done and live by Saturday 28th June.

Notes:

• This probably about 1 day of work or less

• A more comprehensive, multi-page version of the site will follow over the coming weeks, featuring detailed page designs and broader scope.

• This MVP is designed to be quick, functional, and brand-aligned – not fully feature-complete.

Job Qualifications

Job Benefits

Job Responsibilities

  • Base Template Adaptation
  • Use the existing workflow template as the foundation
  • Modify layout and sections to accommodate supplied content
  • Rework layout to allow space for concise subtext
  • Reduce size of existing hero text if needed
  • Rotating Value Proposition Section
  • Introduce a cycling feature that showcases key terms (e.g., “Tokenized Property”) with corresponding graphic elements
  • Add an accordion-style FAQ section
  • Branding Implementation
  • Apply supplied brand guidelines (funky fonts, color palette, basic logo)
  • Install and apply required web fonts
  • Source suitable imagery if client assets are not provided in time
  • Technical Setup
  • Assist with domain setup, connection, and go-live support
  • This probably about 1 day of work or less
  • A more comprehensive, multi-page version of the site will follow over the coming weeks, featuring detailed page designs and broader scope
  • This MVP is designed to be quick, functional, and brand-aligned – not fully feature-complete